PEEK Plastic Rods


PEEK Rods provides excellent chemical resistance combined with heat resistance to 480 F.

PEEK Rods

PEEK Chemical Resistance

PEEK Rods Technical Data Sheet

PEEK Rods 
Part # Diameter (in.) Price Per Foot Order Online
KR-832 1/4 $13.93 Add to Order
KR-208 3/8 $20.41 Add to Order
KR-209 1/2 $32.93 Add to Order
KR-210 5/8 $48.63 Add to Order
KR-211 3/4 $61.11 Add to Order
KR-841 1.0 $104.22 Add to Order
KR-2123 1 1/4 $166.28 Add to Order
KR-833 1 1/2 $212.20 Add to Order
KR-3367 1 3/4 $371.38 Add to Order
KR-213 2.0 $376.06 Add to Order
KR-2124 2 1/4 $564.59 Add to Order
KR-834 2 1/2 $665.75 Add to Order
KR-214 3.0 $765.00 Add to Order
KR-4138 3 1/2 $1,326.56 Add to Order
KR-835 4.0 $1,323.67 Add to Order
KR-5694 4 1/4 $2,172.02 Add to Order
KR-5609 4 1/2 $2,534.88 Add to Order
KR-4152 5.0 $2,684.25 Add to Order
Rev. 03-25, 03-24, 01-24, 04-23

Technical Data

PEEK Glass Filled Rod

PEEK Glass Filled Rods, Ketron® GF3
Mil-P-46183 Type 2, Class 3  
 
Part # Diameter (in.) Price Per Foot Order Online
KR-840 1/2 $60.93 Add to Order
KR-3355 5/8 $87.88 Add to Order
KR-3354 3/4 $126.18 Add to Order
KR-3343 7/8 $208.55 Add to Order
KR-841X 1.0 $238.34 Add to Order
KR-842 1 1/4 $372.60 Add to Order
KR-843 1 1/2 $525.53 Add to Order
KR-3353 1 3/4 $658.01 Add to Order
KR-3352 2.0 $824.32 Add to Order
KR-2090 2 1/2 $1,316.98 Add to Order
Rev. 04-22, 01-22

PEEK Carbon Filled Rod

The addition of carbon fibers enhances the compressive strength and stiffness of PEEK, and dramatically lowers its expansion rate. It offers designers optimum wear resistance and load carrying capability in a PEEK-based product. This grade provides 3.5 times higher thermal conductivity than unreinforced PEEK-dissipating heat from the bearing surface faster.

PEEK 30% Carbon Filled Rods, Ketron® CF30
Technical Data
Part # Diameter (in.) Price Per Foot Order Online
KR-837 5/8 $133.07 Add to Order
KR-3349 3/4 $203.89 Add to Order
KR-3365 1.0 $660.04 Add to Order
KR-3345 1 1/4 $499.02 Add to Order
KR-3346 1 1/2 $763.80 Add to Order
Rev. 04-23, 04-22, 01-22, 06-21